Public Works for Water, Pollution Control, and Power Development and Atomic Energy Commission Appropriations for Fiscal Year 1973: Hearings Before a Subcommittee of the Committee on Appropriations, United States Senate, Ninety-second Congress, Second Session ...U.S. Government Printing Office, 1972 |
No grāmatas satura
1.–5. rezultāts no 52.
27. lappuse
... WALTER , JR . , USA , ASSISTANT DIRECTOR OF CIVIL WORKS FOR CENTRAL DIVISIONS COL . THOMAS W. NELSON , USA ... Colonel , we have also heard from conservation interests that building the Tennessee - Tombigbee Waterway would lead to the ...
... WALTER , JR . , USA , ASSISTANT DIRECTOR OF CIVIL WORKS FOR CENTRAL DIVISIONS COL . THOMAS W. NELSON , USA ... Colonel , we have also heard from conservation interests that building the Tennessee - Tombigbee Waterway would lead to the ...
71. lappuse
... Colonel WALTER . The corps was authorized to conduct this study as a part of a pilot program of studies to examine alternative means for achieving very high levels of wastewater treatment . We do not at this time anticipate constructing ...
... Colonel WALTER . The corps was authorized to conduct this study as a part of a pilot program of studies to examine alternative means for achieving very high levels of wastewater treatment . We do not at this time anticipate constructing ...
73. lappuse
... Colonel WALTER . The Helm Lake was authorized in 1968 as part of the plan for the Wabash Basin and specifically for the Little Wabash subbasin . The authorized project purposes include : flood control , water quality control , water ...
... Colonel WALTER . The Helm Lake was authorized in 1968 as part of the plan for the Wabash Basin and specifically for the Little Wabash subbasin . The authorized project purposes include : flood control , water quality control , water ...
74. lappuse
... Colonel WALTER . Project changes have resulted from detailed studies and extensive coordination with other Federal agencies , the State of Illinois , and local interests . The changes are discussed as follows : The flood control storage ...
... Colonel WALTER . Project changes have resulted from detailed studies and extensive coordination with other Federal agencies , the State of Illinois , and local interests . The changes are discussed as follows : The flood control storage ...
75. lappuse
... Colonel WALTER . Existing and proposed land treatment plans , along with the new State and Federal laws dealing with water pollution , are expected to provide a satisfactory quality of water in the proposed lake . Land treatment which ...
... Colonel WALTER . Existing and proposed land treatment plans , along with the new State and Federal laws dealing with water pollution , are expected to provide a satisfactory quality of water in the proposed lake . Land treatment which ...
Citi izdevumi - Skatīt visu
Public Works for Water, Pollution Control, and Power Development and Atomic ... United States. Congress. Senate. Committee on Appropriations Priekšskatījums nav pieejams - 1972 |
Bieži izmantoti vārdi un frāzes
acre-feet acres Allocations to date ARMSTRONG authorized average annual benefits Balance to complete benefit-cost ratio benefit-to-cost ratio budget request capability Chairman channel Colonel IRVING Colonel MILLER Colonel WALTER CONGRESS THE LIBRARY Corps of Engineers cost_ County data Estimated Federal Delaware River downstream dredging Duck River economic ELLENDER environmental impact statement Estimated Federal cost Estimated non-Federal cost estimated project cost Federal cost Corps financial data Estimated fiscal year 1973 fish and wildlife Flood Control Act flood plain House has included initiate preconstruction planning interests have requested irrigation Lake project land levee LIBRARY OF CONGRESS LMFBR Location and Description.-The ment Meramec River miles million MORRIS navigation needs Ohio River operation OPPOSITION Senator STENNIS percent Proposed Operations.-The amount reactor Reimbursement reservoir River Basin Scioto River statement follows storage submit a statement Summarized financial data tion Total estimated project utilized in fiscal Wabash River Wallisville Water Resources water supply
Populāri fragmenti
87. lappuse - A thing is right when it tends to preserve the integrity, stability, and beauty of the biotic community. It is wrong when it tends otherwise.
5. lappuse - Assured Destruction" capability than we will probably need. However, I have repeatedly cautioned that our "Assured Destruction" capability is of such crucial importance to our security that we must be prepared to cope with Soviet strategic threats which are greater than those projected in the latest intelligence estimates. Accordingly, we must continually reexamine the various actions, beyond those which now seem probable, by which the Soviets might seek to strengthen their strategic forces and take...
320. lappuse - Reclamation is spearheading the preparation of a "general plan to meet the future water needs of the Western United States...
5. lappuse - MIRVs and a new improved third stage) in the planned force. 4. The initiation of development of new small reentry vehicles in order to Increase substantially the number of warheads (or penetration aids) which can be carried by a single missile. 5. The development and production of SRAMs for our strategic bombers. These and other measures will not only enhance the survivability of our strategic missile forces but will also greatly increase the number of weapons which we could place over the Soviet...
189. lappuse - ... of each Apollo mission and other space successes, and shrewdly considered the political impact of any major space program presented for his approval and backing. The different flavors of presidential attitude toward the space program were felt in the discussions that NASA went through each year with the Bureau of the Budget or the Office of Management and Budget. In the early years a reasonably well-planned budget secured fairly ready acceptance in the administration. Major issues sparked by...
127. lappuse - Lakes connecting channels and other pertinent reports, with a view to determining the advisability of further improvements in the Great Lakes connecting channels and harbors in the interest of present and prospective...
9. lappuse - 1967 Supplement to the 1962 Report to the President on Civilian Nuclear Power.
5. lappuse - Even if the Soviets in the 1970 period were to assign their entire available missile force to attacks on our strategic forces (reserving only refire missiles and bomber-delivered weapons for urban targets), our analysis shows that, a very large proportion of our alert forces would still survive.
5. lappuse - ABM interceptors by 1972, our strategic missile forces alone could still destroy more than two-fifths of their total population (more than 100 million people), and over three-quarters of their industrial capacity. As the foregoing table demonstrates, beyond 400 one-megaton equivalents optimally delivered, further increments would not meaningfully change the amount of damage inflicted because we would be bringing smaller and smaller cities under attack. These results, of course, reflect the decisions...
9. lappuse - I (EBR-I) which produced the world's first nuclear-generated electric power was built and operated by Argonne National Laboratory from August 1951 through December 1963 to prove the breeding principle In a fast flux reactor, and to establish further the engineering feasibility of using liquid metal coolant.