| 1986 - 524 lapas
...installed and maintained to: (1) Carry sufficient quantities of water to required locations throughout the plant. (2) Properly convey sewage and liquid disposable...operations release or discharge water or other liquid waste on the floor. (d) Toilet facilities. Each plant shall provide its employees with adequate toilet... | |
| 1979 - 978 lapas
...installed and maintained to: (1) Carry sufficient quantities of water to required locations throughout the plant. (2) Properly convey sewage and liquid disposable...operations release or discharge water or other liquid waste on the floor. (d) Toilet facilities. Each plant shall provide its employees with adequate toilet... | |
| 1992 - 476 lapas
...a source of contamination to food, water supplies, equipment, or utensils or creating an unsanitary condition. (4) Provide adequate floor drainage in...operations release or discharge water or other liquid waste on the floor. (5) Provide that there is not backflow from, or cross-connection between, piping... | |
| 1993 - 596 lapas
...a source of contamination to food, water supplies, equipment, or utensils or creating an unsanitary condition. (4) Provide adequate floor drainage in...operations release or discharge water or other liquid waste on the floor. (5) Provide that there is not backflow from, or cross-connection between, piping... | |
| 2002 - 620 lapas
...supplies, equipment, or utensils or creating an unsanitary condition. Food and Drug Administration, HHS (4) Provide adequate floor drainage in all areas where...operations release or discharge water or other liquid waste on the floor. (5) Provide that there is not backflow from, or cross-connection between, piping... | |
| 2000 - 596 lapas
...supplies, equipment, or utensils or creating an unsanitary condition. Food and Drug Administration, HHS (4) Provide adequate floor drainage in all areas where...operations release or discharge water or other liquid waste on the floor. (5) Provide that there is not backflow from, or cross-connection between, piping... | |
| 1989 - 516 lapas
...supplies, equipment, or utensils or creating an unsanitary condition. Food and Drug Administration, HNS (4) Provide adequate floor drainage in all areas where...operations release or discharge water or other liquid waste on the floor. (5) Provide that there is not backflow from, or cross-connection between, piping... | |
| 1997 - 596 lapas
...a source of contamination to food, water supplies, equipment, or utensils or creating an unsanitary condition. (4) Provide adequate floor drainage in all areas where floors are subject to flooding- type cleaning or where normal operations release or discharge water or other liquid waste... | |
| 2002 - 772 lapas
...equipment, and utensils and prevent the creation of insanitary conditions throughout the establishment; (4) Provide adequate floor drainage in all areas where floors are subject to §416.2 flooding-type cleaning or where normal operations release or discharge water or other liquid... | |
| 1990 - 522 lapas
...installed and maintained to: (1) Carry sufficient quantities of water to required locations throughout the plant. (2) Properly convey sewage and liquid disposable waste from the plant. (3) Avoid constituting a source of contamination to food, water supplies, equipment, or utensils or creating... | |
| |