EXHIBIT 31.-LOCAL PURCHASE REQUEST No. 2274 FROM THE POST ENGINEER, FORT Lee, Va., to tHE PURCHASING and Contracting Officer, JUNE 25, 1959. SERVICES: Non-Personal. To furnish all Quantity Unit Price hangar-type metal buildingdecola dom air strip, Fort Lee. Va NOTE: S COMPLET breated framing will be located on Fifteen (15) days from Extension $1,995.00 LET 1.66600 Elferick Constructy 1201 Laurel Lous NOT: Contactor will complete the work within 2 weeks after notifies to Proceed DONEREJONENE the items listed hereon are properly chargeable to the following allotments, the available balances of which are sufficient to cover the cost thereof, and that funds therefor have been committed. d Appropriation Data and Date of Commitment: JUL SUBJECT TO THE AVAILABILITY OF FUNDS 1 1959 Fiscal Officer Menakine & Mano Lor H. P. YATES, Hajor, FC ང་ ། Approval Commanding Officer or his Designee 25 June W. R. RIDLEHUBER Colonel GS Signature 81951 0-62- -21 Army-Fort Lea, Va EXHIBIT 32.-LOCAL PURCHASE REQUEST No. 165 FROM THE POST ENGINEER, FORT LEE, VA., TO THE PURCHASING AND CONTRACTING OFFICER, AUGUST 10, 1959. Knot the items listed hereon are properly chargeable to the following allotments, the available balances of which are sufficient to cover the cost thereof, and that funds therefor have been committed. Appropriation Data and Date of Commitment: AUG 2 1959 Fiscal Officer EXHIBIT 33.-Memorandum From Lt. Col. JULIAN E. PYLant, Post EngINEER, FORT LEE, Va., to Maj. THOMAS S. SWARTZ, JULY 24, 1959. ОМТСЕ AC of S, G-4 Fort Lee Army Airfield Post Engineer 24 July 1959 Major Swarts/fc/984 1. Attached hereto, are purchase requests for material required to complete the construction of the airfield facilities by Co. A, 87th Engineer Battalion (Construction). 2. Company A is scheduled to return to Fort Belvoir on 1 September 1959. In order to accomplish the return move, the unit must quit the job site and cease operations no later than 21 August. Any work not completed at that time, will have to be resumed by local forces. If the crushed stone requested on PR 92-G is not made available beginning 10 August 1959, the access road, aircraft parking apron, and the taxiway cannot be completed by Company A, and although a paved runway will be installed, it will not be usable without the remaining facilities. 3. The completion of these facilities is not within the capability of this office. When considered along with other priority projects underway or soon to be started. The advent of winter will seriously affect work-in-place which has not been completed. It is for these reasons, as well as the urgent need for the airfield, that the attached requests should be given every consideration for approval and immediate action. JULIAN E. PYLANT, Lt. Colonel Exhibit 33.—Memorandum From Lt. Col. JULIAN E. PYLant, Post EngINEER, Fort Lee, Va., TO MAJ. THOMAS S. SWARTZ, JULY 24, 1959. 1. Attached hereto, are purchase requests for material required to complete the construction of the airfield facilitios by Co. A, 87th Engineer Battalion (Construction). 2. Company A is scheduled to return to Fort Belvoir on 1 September 1959. In order to accomplish the return move, the unit must quit the job site and cease operations no later than 21 August. Any work not completed at that time, will have to be resured by local forces. If the crushed stone requested on PR 92-G is not made available beginning 10 August 1959, the access road, aircraft parking apron, and the taxiway cannot be completed by Company A, and although a paved runway will be installed, it will not be usable without the remaining facilities. 3. The completion of these facilities is not within the capability of this office. When considered along with other priority projects underway or soon to be started. The advent of winter will seriously affect work-in-place which has not been completed. It is for these reasons, as well as the urgent need for the airfield, that the attached requests should be given every consideration for approval and immediate action. JULIAN B, PYLANT, 1, 2, và |