volumes and may incur continuous costly maintenance. FTE Impact: This activity will require one FTE above the existing FTE cap to serve as the Contracting Officer's Representative (COR).

Program Increases - Multi-Year

Increase necessitated by an annual rise in mandatory and pay related costs ($563,000) and an additional FTE supporting the opening of the National Garden ($62,000).

Bartholdi Park and Fountain Renovation

$5,100,000

[blocks in formation]

This project will provide funding to restore the Bartholdi fountain which was purchased during the 1876 International Centennial Exhibition in Philadelphia, and subsequently moved to Washington, D.C. in 1877.

Increase primarily due to additional requirements for books, office equipment and supplies ($12,000).

[blocks in formation]

Increase due to general rise in cost for supplies related to seasonal displays.

[blocks in formation]

Increase due to growth in visitor volume for specialized exhibits as demonstrated by the July 2003 record for visitation in one month ($39,500) and increased funding requirements for employee safety training ($35,000).

[blocks in formation]

This activity will replace the existing roof on the D.C. Village Production Facility. The existing roof is not weather tight, leaks frequently, and requires increasingly costly maintenance. The work involves removing the existing roof and installing a new weather tight roof. Impact if not funded: The roof will continue to leak in greater

The Fountain, restored to its cast iron metal base in 1986, was expected to last approximately 10 years. The four top coatings have disintegrated and the cast iron is now exposed in areas. Although the fountain is functional, both the top and lower basins leak and many of the water

[graphic]

BG-6 of 8

sprays function sporadically. This project will renovate and restore the
existing fountain and basin which includes: providing and applying a
coating treatment to the deteriorating metal finish; upgrading and
replacing all plumbing; upgrading the electrical components; installing
a new utility vault, basin, light fixtures, and 19th century replicas of the
original light fixtures and basin standards. All irrigation to the fountain
and Bartholdi Park will be replaced. Most of the park currently does
not have an irrigation system and requires high maintenance and
manpower during the summer months. Additionally, the deteriorating
sidewalk will be replaced to meet ADA requirements. Impact if not
funded: The Bartholdi sculpture will continue to deteriorate and the
fountain will become inoperable. Additionally, the park will not be
ADA accessible. FTE Impact: This project may require one FTE above
the existing FTE cap to serve as the Contracting Officer's
Representative (COR).

BG-7 of 8

[blocks in formation]

* FY 2003 Actual represents total obligations of funds incurred in FY 2003, irrespective of the year of appropriation

392,000

1,308,000 499,000 60,000 392,000

1,043,000 627,000

(265,000)

128,000

50,000

(10,000)

5,343,000

4,951,000

BG-8 of 8

1793

CAPITOL

INTRODUCTION

CAPITOL VISITOR CENTER

The appropriation previously provided funding for the construction of the Capitol Visitor Center (CVC). This Fiscal Year 2005 budget request provides funds for the operation, administration, and facility management that will support the required activities and programs for the following line items: transitional and stand-up costs, guide services, visitor services, exhibits, food services, and gift shops that impact the operation of the CVC Facility. In addition, the request for funding is being recommended by the Capitol Preservation Commission members (CPC) and is based on the U.S. Capitol Visitor Center Master Operations Plan provided by JM Zell Partners.

SIGNIFICANT CHANGES

Significant changes supporting for the operations of the CVC include the following: Transition Support ($2,400,000); Gift Shop ($1,200,000); and Visitor Services Support ($1,000,000).

FULL-TIME EQUIVALENT REQUIREMENTS

The FY 2005 FTE requirement contained in the below table reflects an increase of 16 FTEs over the FY 2004 level of 16.

[blocks in formation]

OF 2

ARCHITECT OF THE CAPITOL

Capitol Visitor Center

The Fiscal Year 2005 CVC Budget consists of an annual budget and a multi-year budget which are summarized in the following table:

[blocks in formation]

The increase of 16 FTEs is to support the new emerging CVC facility.
Specifically, the increase of 16 FTEs comprises of nine FTEs to provide
support for the Visitor Services; five FTEs for the Exhibits Gallery support;
and two FTEs for construction project support.

ANNUAL BUDGET

The FY 2005 annual budget request for the Capitol Visitor Center is $1,594,000, which is a $1,307,000 increase above the FY 2004 budget of $287,000. The annual budget consists of recurring payroll costs associated with the stand-up of this facility. The justification for the proposed increase in the recurring CVC annual budget for FY 2005 is provided in the section titled, "Analysis of Change."

MULTI-YEAR BUDGET

The FY 2005 multi-year budget request is $6,875,000. The basis for this multi-year budget plan is the result of the CVC Master Operations Plan provided by J.M. Zell Partners and recommended by the Capitol Preservation Commission (CPC). This plan is the main source of funding documentation that formulates the FY 2005 multi-year budget request for the CVC. Also included in this budget request is the U. S. Capitol Police request of $800,000 to support their CVC facilities build-out. Descriptions and justifications for the FY 2005 multi-year budget request can be found in the section titled, "Analysis of Change."

CVC-1 of 6

[graphic]
[graphic][graphic][merged small][merged small]

CAPITOL VISITOR CENTER DETAILED FY 2004 BUDGET (S)

ANNUAL RECURRING (5)

FY03
ΕΟΥ ΒΑ

FY 03
Obligation

FY 04

Enacted

FY05
Request

289,000

1,594,000

289,000

1,594,000

FY 04 to FY05
Difference

1,305,000
1,305,000

MULTI-YEAR (3)

Description

FY03
EOY BA

FY03
Obligation

FY04
Enacted

FYOS

FY04 to FY0S

Description

FY03 EOY BA

NO-YEAR (3)
FY 03
Obligation

[blocks in formation]

FY 04
Enacted

750,000
47,800,000
48,550,000

[blocks in formation]
[blocks in formation]
[blocks in formation]
[blocks in formation]