Lapas attēli
PDF
ePub

OF

CAPITOL

LIBRARY BUILDINGS & GROUNDS

ARCHITECT OF THE CAPITOL

Library Buildings and Grounds

1793

INTRODUCTION

The Architect of the Capitol is responsible for the structural and mechanical care of the five Library of Congress (LOC) buildings: the Thomas Jefferson Building (TJB), John Adams Building (JAB), James Madison Memorial Building (JMMB), Book Storage Module 1, and the Special Facilities Center; and care of the grounds. Additionally, new storage facilities are under design and construction at Fort Meade, Maryland. A new Library facility will also be added in the future when the Culpeper, Virginia, audio visual facility is transferred from a private donor. AOC responsibilities include liaison with various offices of the LOC to coordinate required activities and programs and coordination of construction management activities that affect the operation of the Library buildings.

FY 2005 LIBRARY BUILDINGS & GROUNDS BUDGET

The FY 2005 LOC Budget consists of an annual budget and a multi-year budget which are summarized in the following table:

[blocks in formation]

Significant changes include the Copyright Deposit Facility ($59,200,000); Fort Meade Modules 3 & 4 ($39,500,000); Sprinkler and Smoke Detector Upgrades ($20,204,000); Study, Design, and Condition Assessments ($9,720,000); and ADA Bathroom Renovations, JAB ($3,700,000).

FULL-TIME EQUIVALENT REQUIREMENTS

The FY 2005 FTE requirement contained in the below table reflects an increase of four FTEs over the FY 2004 level of 153.

[blocks in formation]

The increase of four FTEs includes three FTEs being realigned from the General Administration appropriation that are currently supporting the Electronics Engineering Division, and one new FTE to support the AOC's safety program.

ANNUAL BUDGET

The FY 2005 LOC annual budget request is $22,579,000 which represents a 27.1% increase over the FY 2004 budget of $17,768,000. The annual budget consists of "Annual Recurring” and “Annual Nonrecurring" costs. Annual Recurring costs are broken down into Program Groups (as defined in the AOC General Statement) and Annual Nonrecurring costs are broken down into discrete activities. Justifications for the 27.1% increase in the LOC annual budget for FY 2005 are provided in the section titled, "Analysis of Change."

MULTI-YEAR BUDGET

The FY 2005 LOC multi-year budget request is $138,099,000, which represents an increase of $116,939,000 over the FY 2004 budget of $21,160,000. Where appropriate, 100% design documentation was received for projects prior to requesting construction funding. The Librarian of Congress was also included in the budget preparation process for the Library Buildings and Grounds. Project descriptions and justifications for FY 2005 multi-year projects can be found in the section titled, "Analysis of Change."

LOC-1 of 14

THE ARCHIT

[graphic]

LIBRARY BUILDINGS & GROUNDS DETAILED FY 2005 BUDGET ($)

[blocks in formation]

Miscellaneous Improvements (M)

245,000

231,607

315,000

200,000

Total

11,217,500

11,077,885

13,235,000

19,469,000

98,000
(115,000)
6,234,000

LOC-2 of 14

[graphic][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small]
[blocks in formation]

LIBRARY OF CONGRESS BUILDINGS & GROUNDS-ANALYSIS OF CHANGE

[blocks in formation]

ADA Modifications, Pickford Theater................................................................................................................
Landscaping, Ft. Mead.............

Replace High Voltage Switchgear, LOC..

Elevator Modernization...

Collections Security.

[ocr errors]

(1,997)

(1,280)

(504)

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]
« iepriekšējāTurpināt »