House Office Buildings ARCHITECT OF THE CAPITOL
The Architect of the Capitol, subject to the approval and direction of the House Office Building Commission, is responsible for the structural, mechanical, and domestic care and maintenance of the four House Office Buildings (HOB) and the House Page Dormitory at 501 First Street. This appropriation provides for the structural, mechanical, and domestic care of the Cannon (CHOB), Longworth (LHOB), Rayburn (RHOB) and Ford House Office Buildings (FHOB), garages, and the House Annexes, the House subways, and the operation of the mechanical equipment. The Cannon and Longworth Buildings each contain approximately 500 office and committee rooms, together with storage rooms, shops, transformer stations, tunnels, subways, garage accommodations, restaurants, and other miscellaneous facilities. The Rayburn Building contains approximately 700 office and committee rooms, together with storage rooms, shops, transformer rooms, subways, tunnels and other miscellaneous facilities; the Rayburn Building has a garage in its substructure accommodating 2,400 vehicles.
FY 2005 HOUSE OFFICE BUILDINGS BUDGET
The FY 2005 HOB Budget consists of an annual budget and a multi-year budget which are summarized in the following table:
Significant changes include the House Chief Administrative Officer Project Support ($10,700,000); Design Parking Garages, Lot 7 & 9 ($10,000,000); Design Renovation Upgrades, CHOB ($7,500,000); Replace Windows, FHOB ($4,900,000); and Emergency Lighting, RHOB ($4,700,000).
FULL-TIME EQUIVALENT REQUIREMENTS
The FY 2005 FTE requirement contained in the below table reflects an increase of ten FTEs over the FY 2004 level of 502.
The increase of ten FTEs includes six FTEs being realigned from the General Administration appropriation that are currently supporting the Electronics Engineering Division, and four new FTEs to support the AOC's safety program.
The FY 2005 annual budget request for the House Office Buildings is $39,445,000 which represents a 13.2% increase above the FY 2004 budget of $34,859,000. The annual budget consists of "Annual Recurring" and "Annual Non-recurring" costs. Annual Recurring costs are broken down into Program Groups (as defined in the AOC General Statement) and Annual Non-recurring costs are broken down into discrete activities. Justifications for specific increases in the HOB annual budget for FY 2005 are provided in the section titled, “Analysis of Change."
The FY 2005 multi-year budget request is $66,230,000, which represents a $38,644,000 increase over the FY 2004 budget of $27,586,000. Where appropriate, 100% design documentation was received for projects prior to requesting construction funding. The House Chief Administrative Offic and the Clerk of the House were included in the budget preparation process for the HOB. Project descriptions and justifications for FY 2005 multi-year projects can be found in the section titled, "Analysis of Change."
HOUSE OFFICE BUILDINGS DETAILED FY 2005 BUDGET (S)
Escalator Modernizations..
Replace Halon System.........
Wayfinding and ADA-Compliant Signage..
Sound Improvements, Committee Room..............................................
Upgrade Public Restrooms.............................................................................................................
Total, Program Decreases..........................................................
Mandatory Pay and Related Costs:
Realignment of FTEs to HOB...
Cost of Living - Annualization of Cost of Living 2003.
Existing Fire Alarm System Upgrade Study & Design..
Fire Alarm System Upgrade, HOB (Less RHOB)..
Rescission Offset.................................................................................. Total, Program Increase.........................¶¶¶¶¶........ Net Increase