and subject to review under section 313(b) of the Federal Power Act [16 U.S.C. 8257(b)], whether any of the benefits referred to in paragraph (1) should be available for such facilities and whether applications for preliminary permits (or licenses where no preliminary permit has been issued) for such small power production facilities utilizing new dams or diversions should be accepted by the Commission after the moratorium period specified in subsection (e). The report shall include such other administrative and legislative recommendations as the Commission deems appropriate.

"(6) If the study under this subsection has not been completed within 18 months after its initiation, the Commission shall notify the Committees referred to in paragraph (4) of the reasons for the delay and specify a date when it will be completed and a report submitted."

MORATORIUM ON APPLICATION OF THIS SECTION TO NEW DAMS

Section 8(e) of Pub. L. 99-495 provided that: "Notwithstanding the amendments made by subsection (a) of this section [amending section 824a-3 of this title], in the case of a project for which a license or exemption is issued after the enactment of this Act [Oct. 16, 1986], section 210 of the Public Utility Regulatory Policies Act of 1978 [16 U.S.C. 824a-3] shall not apply during the moratorium period if the project utilizes a new dam or diversion (as defined in section 210(k) of such Act) unless the project is either

"(1) a project located at a Government dam (as defined in section 3(10) of the Federal Power Act [16 U.S.C. 796(10)]) at which non-Federal hydroelectric development is permissible, or

"(2) a project described in paragraphs (2), (3), or (4) of subsection (b) [set out as a note above). For purposes of this subsection, the term 'moratorium period' means the period beginning on the date of the enactment of this Act and ending at the expiration of the first full session of Congress after the session during which the report under subsection (d) [set out as a note above] has been submitted to the Congress." SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in title 26 section 136; title 42 section 6807.

§ 824a-4. Seasonal diversity electricity exchange (a) Authority

The Secretary may acquire rights-of-way by purchase, including eminent domain, through North Dakota, South Dakota, and Nebraska for transmission facilities for the seasonal diversity exchange of electric power to and from Canada if he determines

(1) after opportunity for public hearing

(A) that the exchange is in the public interest and would further the purposes referred to in section 2611(1) and (2) of this title and that the acquisition of such rightsof-way and the construction and operation of such transmission facilities for such purposes is otherwise in the public interest,

(B) that a permit has been issued in accordance with subsection (b) of this section for such construction, operation, maintenance, and connection of the facilities at the border for the transmission of electric energy between the United States and Canada as is necessary for such exchange of electric power, and

(C) that each affected State has approved the portion of the transmission route located in each State in accordance with applicable State law, or if there is no such applica

ble State law in such State, the Governor has approved such portion; and

(2) after consultation with the Secretary of the Interior and the heads of other affected Federal agencies, that the Secretary of the Interior and the heads of such,1 other agencies concur in writing in the location of such portion of the transmission facilities as crosses Federal land under the jurisdiction of such Secretary or such other Federal agency, as the case may be.

The Secretary shall provide to any State such cooperation and technical assistance as the State may request and as he determines appropriate in the selection of a transmission route. If the transmission route approved by any State does not appear to be feasible and in the public interest, the Secretary shall encourage such State to review such route and to develop a route that is feasible and in the public interest. Any exercise by the Secretary of the power of eminent domain under this section shall be in accordance with other applicable provisions of Federal law. The Secretary shall provide public notice of his intention to acquire any right-of-way before exercising such power of eminent domain with respect to such right-ofway.

(b) Permit

Notwithstanding any transfer of functions under the first sentence of section 301(b) of the Department of Energy Organization Act [42 U.S.C. 7151(b)], no permit referred to in subsection (a)(1)(B) may be issued unless the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Act [16 U.S.C. 824a(e)] and under the applicable execution order respecting the construction, operation, maintenance, or connection at the borders of the United States of facilities for the transmission of electric energy between the United States and a foreign country. Any finding of the Commission under an applicable executive order referred to in this subsection shall be treated for purposes of judicial review as an order issued under section 202(e) of the Federal Power Act.

(c) Timely acquisition by other means

The Secretary may not acquire any rights-ofday 2 under this section unless he determines that the holder or holders of a permit referred to in subsection (a)(1)(B) of this section are unable to acquire such rights-of-way under State condemnation authority, or after reasonable opportunity for negotiation, without unreasonably delaying construction, taking into consideration the impact of such delay on completion of the facilities in a timely fashion. (d) Payments by permittees

(1) The property interest acquired by the Secretary under this section (whether by eminent domain or other purchase) shall be transferred by the Secretary to the holder of a permit referred to in subsection (b) of this section if such

'So in original. Comma probably should be deleted. * So in original. Probably should be "rights-of-way".

TITLE 16-CONSERVATION

holder has made payment to the Secretary of the entire costs of the acquisition of such property interest, including administrative costs. The Secretary may accept, and expend, for purposes of such acquisition, amounts from any such person before acquiring a property interest to be transferred to such person under this section.

(2) If no payment is made by a permit holder under paragraph (1), within a reasonable time, the Secretary shall offer such rights-of-way to the original owner for reacquisition at the original price paid by the Secretary. If such original owner refuses to reacquire such property after a reasonable period, the Secretary shall dispose of such property in accordance with applicable provisions of law governing disposal of property of the United States.

(e) Federal law governing Federal lands

This section shall not affect any Federal law governing Federal lands.

(f) Reports

The Secretary shall report annually to the Congress on the actions, if any, taken pursuant to this section.

(Pub. L. 95-617, title VI, § 602, Nov. 9, 1978, 92 Stat. 3164.)

REFERENCES IN TEXT

The Secretary, referred to in subsecs. (a), (c), (d), and (f), means the Secretary of Energy. See section 2602(14) of this title.

The Commission, referred to in subsec. (b), means the Federal Energy Regulatory Commission. See section 2602(3) of this title.

CODIFICATION

Section was enacted as part of the Public Utility Regulatory Policies Act of 1978, and not as part of the Federal Power Act which generally comprises this chapter.

§ 824b. Disposition of property; consolidations; purchase of securities

(a) Authorizations

No public utility shall sell, lease, or otherwise dispose of the whole of its facilities subject to the jurisdiction of the Commission, or any part thereof of a value in excess of $50,000, or by any means whatsoever, directly or indirectly, merge or consolidate such facilities or any part thereof with those of any other person, or purchase, acquire, or take any security of any other public utility, without first having secured an order of the Commission authorizing it to do so. Upon application for such approval the Commission shall give reasonable notice in writing to the Governor and State commission of each of the States in which the physical property affected, or any part thereof, is situated, and to such other persons as it may deem advisable. After notice and opportunity for hearing, if the Commission finds that the proposed disposition, consolidation, acquisition, or control will be consistent with the public interest, it shall approve the same.

(b) Orders of Commission

The Commission may grant any application for an order under this section in whole or in

Page 44

part and upon such terms and conditions as it finds necessary or appropriate to secure the maintenance of adequate service and the coordination in the public interest of facilities subject to the jurisdiction of the Commission. The Commission may from time to time for good cause shown make such orders supplemental to any order made under this section as it may find necessary or appropriate.

(June 10, 1920, ch. 285, pt. II, § 203, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 849.)

TRANSFER OF FUNCTIONS

Federal Power Commission terminated and its functions with regard to establishment, review, and enforcement of rates and charges for transmission or sale of electric energy, including determinations on construction work in progress under this subchapter transferred to Federal Energy Regulatory Commission by sections 7172(a)(1)(B) and 7293 of Title 42, The Public Health and Welfare.

Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.

§ 824c. Issuance of securities; assumption of liabilities (a) Authorization by Commission

No public utility shall issue any security, or assume any obligation or liability as guarantor, indorser, surety, or otherwise in respect of any security of another person, unless and until, and then only to the extent that, upon application by the public utility, the Commission by order authorizes such issue or assumption of liability. The Commission shall make such order only if it finds that such issue or assumption (a) is for some lawful object, within the corporate purposes of the applicant and compatible with the public interest, which is necessary or appropriate for or consistent with the proper performance by the applicant of service as a public utility and which will not impair its ability to perform that service, and (b) is reasonably necessary or appropriate for such purposes. The provisions of this section shall be effective six months after August 26, 1935.

(b) Application approval or modification; supplemental orders

The Commission, after opportunity for hearing, may grant any application under this section in whole or in part, and with such modifications and upon such terms and conditions as it may find necessary or appropriate, and may from time to time, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as it may find necessary or appropriate, and may by any such supplemental order modify the provisions of any previous order as to the particular purposes, uses, and extent to which, or the conditions under which, any security so theretofore authorized or the proceeds thereof may be applied, subject always to the requirements of subsection (a) of this section.

(c) Compliance with order of Commission

No public utility shall, without the consent of the Commission, apply any security or any proceeds thereof to any purpose not specified in the Commission's order, or supplemental order, or to any purpose in excess of the amount allowed for such purpose in such order, or otherwise in contravention of such order.

(d) Authorization of capitalization not to exceed amount paid

The Commission shall not authorize the capitalization of the right to be a corporation or of any franchise, permit, or contract for consolidation, merger, or lease in excess of the amount (exclusive of any tax or annual charge) actually paid as the consideration for such right, franchise, permit, or contract.

(e) Notes or drafts maturing less than one year after issuance

Subsection (a) of this section shall not apply to the issue or renewal of, or assumption of liability on, a note or draft maturing not more than one year after the date of such issue, renewal, or assumption of liability, and aggregating (together with all other then outstanding notes and drafts of a maturity of one year or less on which such public utility is primarily or secondarily liable) not more than 5 per centum of the par value of the other securities of the public utility then outstanding. In the case of securities having no par value, the par value for the purpose of this subsection shall be the fair market value as of the date of issue. Within ten days after any such issue, renewal, or assumption of liability, the public utility shall file with the Commission a certificate of notification, in such form as may be prescribed by the Commission, setting forth such matters as the Commission shall by regulation require.

(f) Public utility securities regulated by State not affected

The provisions of this section shall not extend to a public utility organized and operating in a State under the laws of which its security issues are regulated by a State commission. (g) Guarantee or obligation on part of United States Nothing in this section shall be construed to imply any guarantee or obligation on the part of the United States in respect of any securities to which the provisions of this section relate. (h) Filing duplicate reports with the Securities and Exchange Commission

Any public utility whose security issues are approved by the Commission under this section may file with the Securities and Exchange Commission duplicate copies of reports filed with the Federal Power Commission in lieu of the reports, information, and documents required under sections 77g, 781, and 78m of title 15.

(June 10, 1920, ch. 285, pt. II, § 204, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 850.)

TRANSFER OF FUNCTIONS

Federal Power Commission terminated and its functions with regard to establishment, review, and en

forcement of rates and charges for transmission or sale of electric energy, including determinations on construction work in progress under this subchapter transferred to Federal Energy Regulatory Commission by sections 7172(a)(1)(B) and 7293 of Title 42, The Public Health and Welfare.

Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.

Executive and administrative functions of Securities and Exchange Commission, with certain exceptions, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 10 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out in the Appendix to Title 5, Government Organization and Employees.

§ 824d. Rates and charges; schedules; suspension of new rates; automatic adjustment clauses

(a) Just and reasonable rates

All rates and charges made, demanded, or received by any public utility for or in connection with the transmission or sale of electric energy subject to the jurisdiction of the Commission, and all rules and regulations affecting or pertaining to such rates or charges shall be just and reasonable, and any such rate or charge that is not just and reasonable is hereby declared to be unlawful.

(b) Preference or advantage unlawful

No public utility shall, with respect to any transmission or sale subject to the jurisdiction of the Commission, (1) make or grant any undue preference or advantage to any person or subject any person to any undue prejudice or disadvantage, or (2) maintain any unreasonable difference in rates, charges, service, facilities, or in any other respect, either as between localities or as between classes of service. (c) Schedules

Under such rules and regulations as the Commission may prescribe, every public utility shall file with the Commission, within such time and in such form as the Commission may designate, and shall keep open in convenient form and place for public inspection schedules showing all rates and charges for any transmission or sale subject to the jurisdiction of the Commission, and the classifications, practices, and regulations affecting such rates and charges, together with all contracts which in any manner affect or relate to such rates, charges, classifications, and services.

(d) Notice required for rate changes

Unless the Commission otherwise orders, no change shall be made by any public utility in any such rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, except after sixty days' notice to the Commission and to the public. Such notice shall be given by filing with the Commission and keeping open for public inspection new schedules stating plainly the change or changes

to be made in the schedule or schedules then in force and the time when the change or changes will go into effect. The Commission, for good cause shown, may allow changes to take effect without requiring the sixty days' notice herein provided for by an order specifying the changes so to be made and the time when they shall take effect and the manner in which they shall be filed and published.

(e) Suspension of new rates; hearings; five-month period

Whenever any such new schedule is filed the Commission shall have authority, either upon complaint or upon its own initiative without complaint, at once, and, if it so orders, without answer or formal pleading by the public utility, but upon reasonable notice, to enter upon a hearing concerning the lawfulness of such rate, charge, classification, or service; and, pending such hearing and the decision thereon, the Commission, upon filing with such schedules and delivering to the public utility affected thereby a statement in writing of its reasons for such suspension, may suspend the operation of such schedule and defer the use of such rate, charge, classification, or service, but not for a longer period than five months beyond the time when it would otherwise go into effect; and after full hearings, either completed before or after the rate, charge, classification, or service goes into effect, the Commission may make such orders with reference thereto as would be proper in a proceeding initiated after it had become effective. If the proceeding has not been concluded and an order made at the expiration of such five months, the proposed change of rate, charge, classification, or service shall go into effect at the end of such period, but in case of a proposed increased rate or charge, the Commission may by order require the interested public utility or public utilities to keep accurate account in detail of all amounts received by reason of such increase, specifying by whom and in whose behalf such amounts are paid, and upon completion of the hearing and decision may by further order require such public utility or public utilities to refund, with interest, to the persons in whose behalf such amounts were paid, such portion of such increased rates or charges as by its decision shall be found not justified. At any hearing involving a rate or charge sought to be increased, the burden of proof to show that the increased rate or charge is just and reasonable shall be upon the public utility, and the Commission shall give to the hearing and decision of such questions preference over other questions pending before it and decide the same as speedily as possible.

(f) Review of automatic adjustment clauses and public utility practices; action by Commission; "automatic adjustment clause" defined

(1) Not later than 2 years after November 9, 1978, and not less often than every 4 years thereafter, the Commission shall make a thorough review of automatic adjustment clauses in public utility rate schedules to examine

(A) whether or not each such clause effectively provides incentives for efficient use of

resources (including economical purchase and use of fuel and electric energy), and

(B) whether any such clause reflects any costs other than costs which are

(i) subject to periodic fluctuations and

(ii) not susceptible to precise determinations in rate cases prior to the time such costs are incurred.

Such review may take place in individual rate proceedings or in generic or other separate proceedings applicable to one or more utilities.

(2) Not less frequently than every 2 years, in rate proceedings or in generic or other separate proceedings, the Commission shall review, with respect to each public utility, practices under any automatic adjustment clauses of such utility to insure efficient use of resources (including economical purchase and use of fuel and electric energy) under such clauses.

(3) The Commission may, on its own motion or upon complaint, after an opportunity for an evidentiary hearing, order a public utility to—

(A) modify the terms and provisions of any automatic adjustment clause, or

(B) cease any practice in connection with the clause,

if such clause or practice does not result in the economical purchase and use of fuel, electric energy, or other items, the cost of which is included in any rate schedule under an automatic adjustment clause.

(4) As used in this subsection, the term "automatic adjustment clause" means a provision of a rate schedule which provides for increases or decreases (or both), without prior hearing, in rates reflecting increases or decreases (or both) in costs incurred by an electric utility. Such term does not include any rate which takes effect subject to refund and subject to a later determination of the appropriate amount of such rate.

(June 10, 1920, ch. 285, pt. II, § 205, as added Aug. 26, 1935, ch. 687, title II, § 213, 49 Stat. 851; amended Nov. 9, 1978, Pub. L. 95-617, title II, §§ 207(a), 208, 92 Stat. 3142.)

AMENDMENTS

1978-Subsec. (d). Pub. L. 95-617, § 207(a), substituted "sixty" for "thirty" in two places.

Subsec. (f). Pub. L. 95-617, § 208, added subsec. (f).

TRANSFER OF FUNCTIONS

Federal Power Commission terminated and its functions with regard to establishment, review, and enforcement of rates and charges for transmission or sale of electric energy, including determinations on construction work in progress under this subchapter transferred to Federal Energy Regulatory Commission by sections 7172(a)(1)(B) and 7293 of Title 42, The Public Health and Welfare.

Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.

STUDY OF ELECTRIC RATE INCREASES UNDER FEDERAL POWER ACT

Section 207(b) of Pub. L. 95-617 directed chairman of Federal Energy Regulatory Commission, in consultation with Secretary, to conduct a study of legal requirements and administrative procedures involved in consideration and resolution of proposed wholesale electric rate increases under Federal Power Act, section 791a et seq. of this title, for purposes of providing for expeditious handling of hearings consistent with due process, preventing imposition of successive rate increases before they have been determined by Commission to be just and reasonable and otherwise lawful, and improving procedures designed to prohibit anticompetitive or unreasonable differences in wholesale and retail rates, or both, and that chairman report to Congress within nine months from Nov. 9, 1978, on results of study, on administrative actions taken as a result of this study, and on any recommendations for changes in existing law that will aid purposes of this section.

SECTION REFERRED TO IN Other SectionS

This section is referred to in sections 808, 824e, 824m of this title; title 15 section 79z-5a; title 42 section 13234.

§ 824e. Power of Commission to fix rates and charges; determination of cost of production or transmis

sion

(a) Unjust or preferential rates, etc.; statement of reasons for changes; hearing; specification of issues Whenever the Commission, after a hearing had upon its own motion or upon complaint, shall find that any rate, charge, or classification, demanded, observed, charged, or collected by any public utility for any transmission or sale subject to the jurisdiction of the Commission, or that any rule, regulation, practice, or contract affected such rate, charge, or classification is unjust, unreasonable, unduly discriminatory or preferential, the Commission shall determine the just and reasonable rate, charge, classification, rule, regulation, practice, or contract to be thereafter observed and in force, and shall fix the same by order. Any complaint or motion of the Commission to initiate a proceeding under this section shall state the change or changes to be made in the rate, charge, classification, rule, regulation, practice, or contract then in force, and the reasons for any proposed change or changes therein. If, after review of any motion or complaint and answer, the Commission shall decide to hold a hearing, it shall fix by order the time and place of such hearing and shall specify the issues to be adjudicated.

(b) Refund effective date; preferential proceedings; statement of reasons for delay; burden of proof; scope of refund order; refund orders in cases of dilatory behavior; interest

Whenever the Commission institutes a proceeding under this section, the Commission shall establish a refund effective date. In the case of proceeding instituted on complaint, the refund effective date shall not be earlier than the date 60 days after the filing of such complaint nor later than 5 months after the expiration of such 60-day period. In the case of a proceeding instituted by the Commission on its own motion, the refund effective date shall not be earlier than the date 60 days after the publi

cation by the Commission of notice of its intention to initiate such proceeding nor later than 5 months after the expiration of such 60-day period. Upon institution of a proceeding under this section, the Commission shall give to the decision of such proceeding the same preference as provided under section 824d of this title and otherwise act as speedily as possible. If no final decision is rendered by the refund effective date or by the conclusion of the 180-day period commencing upon initiation of a proceeding pursuant to this section, whichever is earlier, the Commission shall state the reasons why it has failed to do so and shall state its best estimate as to when it reasonably expects to make such decision. In any proceeding under this section, the burden of proof to show that any rate, charge, classification, rule, regulation, practice, or contract is unjust, unreasonable, unduly discriminatory, or preferential shall be upon the Commission or the complainant. At the conclusion of any proceeding under this section, the Commission may order the public utility to make refunds of any amounts paid, for the period subsequent to the refund effective date through a date fifteen months after such refund effective date, in excess of those which would have been paid under the just and reasonable rate, charge, classification, rule, regulation, practice, or contract which the Commission orders to be thereafter observed and in force: Provided, That if the proceeding is not concluded within fifteen months after the refund effective date and if the Commission determines at the conclusion of the proceeding that the proceeding was not resolved within the fifteen-month period primarily because of dilatory behavior by the public utility, the Commission may order refunds of any or all amounts paid for the period subsequent to the refund effective date and prior to the conclusion of the proceeding. The refunds shall be made, with interest, to those persons who have paid those rates or charges which are the subject of the proceeding.

(c) Refund considerations; shifting costs; reduction in revenues; "electric utility companies” and “registered holding company" defined

Notwithstanding subsection (b) of this section, in a proceeding commenced under this section involving two or more electric utility companies of a registered holding company, refunds which might otherwise be payable under subsection (b) of this section shall not be ordered to the extent that such refunds would result from any portion of a Commission order that (1) requires a decrease in system production or transmission costs to be paid by one or more of such electric companies; and (2) is based upon a determination that the amount of such decrease should be paid through an increase in the costs to be paid by other electric utility companies of such registered holding company: Provided, That refunds, in whole or in part, may be ordered by the Commission if it determines that the registered holding company would not experience any reduction in revenues which results from an inability of an electric utility company of the holding company to re