Slēptie lauki
Grāmatas Grāmatas
" This is equivalent to 5.2 cubic feet for each million gallons of sewage pumped at Deer Island. The material intercepted at the screens at the South Metropolitan sewerage stations has amounted to... "
Annual Report of the Metropolitan Water and Sewerage Board - 158. lappuse
autors: Massachusetts. Metropolitan Water and Sewerage Board - 1912
Pilnskats - Par šo grāmatu

Annual Report, 16. sējums

1917 - 256 lapas
...screens at the South Metropolitan Sewerage stations has amounted to 2,894.6 cubic yards, equal to 3.44 cubic feet per million gallons of sewage delivered...Studies of sewage flows in the Metropolitan sewers and siphons indicate that they are free from deposit. FREDERICK D. SMITH, Chief Engineer of Sewerage...
Pilnskats - Par šo grāmatu

Annual Report, 5. sējums

Massachusetts. Metropolitan Water and Sewerage Board - 1906 - 282 lapas
...intercepted at the screens at the stations of this system has amounted to 1,986 cubic yards, equal to 5.9 cubic feet per million gallons of sewage delivered...Metropolitan sewers, siphons and outfall pipes indicate they are satisfactorily free from deposit, and in normal condition. Respectfully submitted, WM. M....
Pilnskats - Par šo grāmatu

Public Documents of Massachusetts, 4. sējums

Massachusetts - 1907 - 1174 lapas
...screens at the South Metropolitan sewerage stations has amounted to 2,942 cubic yards, equal to 6.5 cubic feet per million gallons of sewage delivered...sewers, siphons and outfall pipes indicate that they are satisfactorily free from deposit and in normal condition. Respectfully submitted, WM. M. BROWN, Engineer...
Pilnskats - Par šo grāmatu

Annual Report

Massachusetts. Metropolitan Water and Sewerage Board - 1908 - 304 lapas
...screens at the South Metropolitan sewerage stations has amounted to 2,735.6 cubic yards, equal to 5.0 cubic feet per million gallons of sewage delivered...sewers, siphons and outfall pipes indicate that they are satisfactorily free from deposit and in normal condition. Respectfully submitted, WM. M. BROWN, Chief...
Pilnskats - Par šo grāmatu

Annual Report, 7. sējums

1908 - 306 lapas
...screens at the South Metropolitan sewerage stations has amounted to 2,735.6 cubic yards, equal to 5.0 cubic feet per million gallons of sewage delivered...sewers, siphons and outfall pipes indicate that they are satisfactorily free from deposit and in normal condition. Respectfully submitted, WM. M. BROWN, Chief...
Pilnskats - Par šo grāmatu

Annual Report, 9. sējums

1910 - 332 lapas
...material intercepted at the screens at the South Metropolitan sewerage stations has amounted to 2,342.3 cubic yards, equal to 4.3 cubic feet per million gallons...they are free from deposit. Respectfully submitted, WM. M. BROWN, Chief Engineer of Sewerage Works. BOSTON, January 1, 1910. APPENDIX. APPENDIX No. 1....
Pilnskats - Par šo grāmatu

Public Documents of Massachusetts, 4. sējums

Massachusetts - 1910 - 1360 lapas
...material intercepted at the screens at the South Metropolitan sewerage stations has amounted to 2,342.3 cubic yards, equal to 4.3 cubic feet per million gallons...they are free from deposit. Respectfully submitted, BOSTON, January I, 1910. WM. M. BROWN, Chief Engineer of Sewerage Works. APPENDIX APPENDIX No. 1. STATEMENT...
Pilnskats - Par šo grāmatu

Public Documents of Massachusetts, 4. sējums

Massachusetts - 1912 - 1052 lapas
...138,000 145,000 169,000 562,000 300,000 100 1,172,000 902,000 833,000 3,068,000 1,470,000 2,700,000 hour each day. As at present operated, this involves...APPENDIX No. 1. CONTRACTS MADE AND PENDING DURING [NOTE. — The details of contracts made before 1 Contract based upon this bid. ' Contract completed....
Pilnskats - Par šo grāmatu

Annual Report, 11. sējums

Massachusetts. Metropolitan Water and Sewerage Board - 1912 - 286 lapas
...this involves no increase in cost of coal or labor at the Nut Island Screen-house. SOUTH METBOPOLITAN OUTFALLS. The 60-inch outfall pipes in the harbor...APPENDIX No. 1. CONTRACTS MADE AND PENDING DURING [NOTE. — The details of contracts made before 1 Contract based upon this bid. 2 Contract completed....
Pilnskats - Par šo grāmatu

Annual Report, 13. sējums

1914 - 242 lapas
...screens at the South Metropolitan Sewerage stations has amounted to 2,517.27 cubic yards, equal to 3.51 cubic feet per million gallons of sewage delivered at the outfall works at Nut Island. Studies of the sewage flows indicate that the Metropolitan sewers and siphons are free from deposit. FREDERICK...
Pilnskats - Par šo grāmatu




  1. Mana bibliotēka
  2. Palīdzība
  3. Izvērstā grāmatu meklēšana
  4. Lejupielādējiet ePub
  5. Lejupielādēt PDF