Lapas attēli
PDF
ePub
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Library Buildings and Grounds, Structural and Mechanical Care

[blocks in formation]

Estimate 1994

Summary

Library Buildings and Grounds,

Structural and Mechanical Care

1993 Appropriation in annual act.

Summary

1993 Nonrecurring Deductions

HVAC Systems for Gym, East Capitol & 6th Street
Building.

Positions

Amount

Upgrade Fire Alarm System, Madison Building.
Install Central Clock Control System, Jefferson and

Adams Building.......

Total 1993 Nonrecurring Deductions.

Total 1994. Bass

Increases

$ 278,000 125,000

150.000

Mandatory Items

Within-grade Promotions, Wage Board Employees.
Within-grade Salary Advancements and Other

113,000

Changes, GS Employees.......

15,000

Overtime........

101,000

Night Differential and Sunday Premium Pay.

6,000

Wage Rate Increases, Wage Board Employees,

January, 1993 pay raise.....

63,000

Increased Civilian Pay Act Cost, January, 1993.

5,000

[blocks in formation]

Library Buildings and Grounds ARCHITECT OF THE CAPITOL

Restoration of Abolished Positions

WG-10 Air Conditioning Equipment Mechanic.......
Total, Restoration of Abolished Positions.

1

$ 51,000

1

51,000

Estimate 1994

Summary

Library Buildings and Grounds,

Structural and Mechanical Care (continued)

Library Buildings and Grounds, Structural and Mechanical Care

Increases (continued)

Mandatory Items (continued)

Wage Rate Increases, Wage Board Employees,

January, 1994 pay raise......

Increased Civilian Pay Cost, January, 1994.
Contributions to Retirement Funds.

Contributions to Health Benefits Funds.

Locality Pay......

Total Mandatory Items.

Summary
(continued)

Annual Recurring Maintenance

General Annual Repairs.

Miscellaneous Improvements

Exterior Pointing and Caulking.

Asbestos Abatement........

Total Annual Recurring Maintenance.

Positions

Amount

Positions

Amount

$ 102,000

8,000

110,000
32,000
146.000

701,000

$ 3,000

50,000 3,000

8.000

64,000

10.2

Positions

ABOUDE

Library Buildings and Grounds, Structural and Mechanical Care

[ocr errors]
[blocks in formation]

Estimate 1994

Summary

Library Buildings and Grounds,

Structural and Mechanical Care (continued)

Summary (continued)

Nonrecurring Items

Cyclical Maintenance

Modifications to Existing Security System,

Madison Building...

Replace Electronic Book Conveyor System Control
Stations, Madison Building.........

Jefferson and Adams Buildings.

Replace Mechanical Book Carrier System Controls,

Repair the Pneumatic Capitol Tube System.

Replace Carrier System Roller Bearings.

Connect and Replace Electromechanical Control System

with Hill-wide EMCS, Madison Building..

Elevator Modernization, Jefferson Building.
Elevator Modernization, Madison Building..
Escalator Modernization, Madison Building.
Roof Replacement, Jefferson Building.
Total Cyclical Maintenance..

1

250,000

60,000
7.000.000
$9.100.000

10.3

[graphic]

Total Increases.

Total Fatimate for 1994.

119

$.12.190.000

13.006.000

$22.186.000

Estimate 1994

Summary

Library Buildings and Grounds,

Structural and Mechanical Care (continued)

Library Buildings and Grounds, Structural and Mechanical Care

Summary
(continued)

Positions

Amount

Positions

Amount

Nonrecurring Items (continued)

Continuing and Initiating Other Programs

Adams, and Madison Buildings.

Install Book Stack Lighting Control Systems, Jefferson,

Classified Materials Storage Vault, Madison Building..

Retrofit Energy Efficient Lighting Systems.

Library Parking Area Security Improvements..

Building Antenna System, Madison Building.
Americans with Disabilities Act Requirements.
Install New Electrical Service for UPS..

Total Continuing and Initiating Other
Programs.

Total Nonrecurring Items.

$ 290,000 50,000

1,000,000

150,000

100,000

750,000

750.000

090.000

10.4

« iepriekšējāTurpināt »