| Nonprofit Housing Center - 1976 - 160 lapas
..."Graphic" (working drawings) properly supplement and complement one another. Supervision The Architect will make periodic visits to the site to familiarize...inspections to check the quality or quantity of the work. Neither will he be responsible for the contractor's failure to carry out the construction work in accordance... | |
| Sanford I. Heisler - 1994 - 524 lapas
...will be in accor dance w-uh the Contract Documents However, the A/chite« shall not be required 10 make exhaustive or continuous on-site inspections to check the quality or quantity of the Work On the basu of on sue observations as an architect, the Architect shall keep the Owner informed of... | |
| Richard A. Holderness, Walker, Stephen D. Butler, Stephen G. Walker - 1995 - 2064 lapas
...documents and general compliance with the applicable building codes. Such observation does not include exhaustive or continuous onsite inspections to check the quality or quantity of construction work. See Iowa Code § 544A.16(8). 17 Id. 18 Iowa Code § 544A.18. (3) Nonstructural alterations20... | |
| Marc M. Schneier - 1999 - 742 lapas
...endeavor to guard the Owner against defects and deficiencies in the Work of the Contractor. The Architect will not be required to make exhaustive or continuous...inspections to check the quality or quantity of the Work. The Architect will not be responsible for construction means, methods, techniques, sequences, or procedures,... | |
| John G. Cameron - 2000 - 780 lapas
...Wort, when fully completed, will be in accordance with the Contract Documents. However, the Architect will not be required to make exhaustive or continuous...inspections to check the quality or quantity of the Work. The Architect will neither have control over or charge of, nor he responsible for, the construction... | |
| Robert F. Cushman, John D. Carter, Douglas F. Coppi, Paul J. Gorman - 2001 - 868 lapas
...endeavor to guard the Owner against defects and deficiencies in the work of the Contractor. The Architect will not be required to make exhaustive or continuous...inspections to check the quality or quantity of the work. The Architect will not be responsible for the construction site, means, methods, techniques, sequences... | |
| Michael K. De Chiara, Michael S. Zetlin - 2003 - 456 lapas
...general if the Work is proceeding in accordance with the Contract Documents. However, the Architect shall not be required to make exhaustive or continuous on-site...inspections to check the quality or quantity of the Work. On the basis of such on-site ' 148 Misc. 2d 926, 562 NYS2d 593 (4th Dep't), aff'd, 561 NYS2d 659 (1990).... | |
| J. William Ernstrom, Kevin F. Peartree - 2003 - 1228 lapas
...Contractor's application for payment shall not be a representation that the Construction Manager has: a. made exhaustive or continuous on-site inspections to check the quality or quantity of the Work; b. reviewed construction means, methods, techniques, sequences or procedures for the Trade Contractor's... | |
| |