| 1884 - 784 lapas
...will be paid at the contract rates for work of a similar character ; or if the extra work or material should be of a class for which no rate is fixed by the contract, a fair price to be paid will be determined by the Secretary of the Interior. But no payment... | |
| 1891 - 1084 lapas
...that may appear necessary, and for this he will be paid at the contract rates for work of a similar character ; or, if the extra work should be of a class for which no rate is fixed by the contract, the fair price to be paid will bo determined by the Engineer Commissioner. Inspectors... | |
| John Butler Johnson - 1895 - 440 lapas
...linear or running foot. (*) For all extra work done by written order of the Boston Water Board, its actual reasonable cost to the contractor, as determined by the engineer, plus fifteen per cent. of said cost. R. And it is agreed that payment for the work embraced in this contract... | |
| John Butler Johnson - 1895 - 444 lapas
...linear or running foot. (#) For all extra work done by written order of the Boston Water Board, its actual reasonable cost to the contractor, as determined by the engineer, plus fifteen per cent, of said cost. R. And it is agreed that payment for the work embraced in this contract... | |
| 1901 - 692 lapas
...contract, the actual reasonable cost to the contractor, as determined by the chief engineer, plus fifteen (15) per cent of said cost, The contractor shall have no claim for compensation for extra work unless the same js ordered in writing by the chief engineer, and unless the claim for the same, when BO ordered,... | |
| United States. War Department - 1901
...writing by the chief engineer, and for this he will be paid at the contract rates for work of a similar character, or, if the extra work should be of a class for which no rate is fixed by the contract, the actual reasonable cost to the contractor, as determined by the chief engineer, plus... | |
| Arvid Reuterdahl - 1908 - 148 lapas
...writing by the Engineer, and for this he shall be paid at current contract rates for work of a similar character, or if the extra work should be of a class...have no claim for compensation for extra work unless the same is ordered in writing by the Engineer. 37. INSPECTION. — All material furnished by the contractor... | |
| 1909 - 308 lapas
...that may appear necessary, and for this he will be paid at current contract rates for work of similar character; or, if the extra work should be of a class...contractor as determined by the engineer, plus 15 per cent. The contractor shall have no claim for compensation for extra work unless the same is ordered in writing... | |
| Massachusetts. Cambridge Bridge Commission, William Jackson - 1909 - 508 lapas
...thousand dollars ($460,000). For extra work done by written order of the Commission, its reasonable cost, as determined by the Engineer, plus 15 per cent, of said cost. Signature of person, firm or corporation making bid: Holbrook, Cabot & Daly. PO address: 1140 Tremont... | |
| 1912 - 368 lapas
...ordered in writing by the engineer, and for this ho will be paid at current rates for work of a similar character, or, if the extra work should be of a class for which no rato is fixed by current contracts, tho actual reasonable cost to the contractor, as determined by... | |
| |