The total cost estimate of the entire project is $2,800,000, of
which $1,800,000 is requested in fiscal year 1994 on a "No Year" basis
for chillers in the east plant (#1, 1A, 2, 2a). The total estimate is
detailed as follows:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

in operation since December 1, 1910.
This appropriation is for the operation and maintenance of the Capitol Power Plant, which has been
It provides heating and air conditioning refrigeration for the
Capitol, Senate and House Office Buildings, and Library of Congress Buildings; heat for the United States
Government Printing Office and the Washington City Post Office,
Botanic Garden; heat and air conditioning for the Senate and House Garages; and steam heat for the
and steam heat and air conditioning for
the Folger Shakespeare Library, Union Station complex, the U. S. Supreme Court Building, and the Thurgood
Marshall Federal Judiciary Building on a reimbursable basis. The Architect of the Capitol performs his
duties in connection with the plant under authority of the Act of March 4, 1911 (36 Stat. 1414).

All electrical energy is now being purchased from the local public utility. Approximately one-half
Power Plant was discontinued.
of the electrical load at the Capitol Power Plant has been purchased since September 1950, and the
remaining one-half load since September 1951 when generation of all electrical energy at the Capitol
The energy purchased for all buildings and grounds under the jurisdiction
of the Architect of the Capitol is now 60-cycle alternating current, having been converted from 25-cycle
alternating current during the period 1951 - 1963 under funds allowed for such purpose by Congress.

Complex will be paid to the D.C. Government pursuant to P.L. 101-168.
In addition to heat, air conditioning and electricity, water and sewer services for the Capitol

percent increase over 1992.
The steam generated by the Capitol Power Plant in fiscal year 1993 was 1,304,737,000 pounds, a 2.6
The steam was supplied to the various buildings served through approximately
3 miles of steam lines. The new steam generators, new tunnel and steam lines, installed under the Capitol
Power Plant Changes and Improvements Project, have been in service since 1954.
increase over 1992.
The output of the re-
frigeration plant in fiscal year 1993 was approximately 88,923,292 ton-hours of refrigeration, a 7.6

The total authorized strength for the Capitol Power Plant staff is 101 positions.

[blocks in formation]
[blocks in formation]

ITEMS UNDER WHICH NO CHANGES OCCUR

Purchase of Chilled Water from GSA for Ford House Office Building.
Purchase of Steam from GSA for Ford House Office Building.

[blocks in formation]
[blocks in formation]
[blocks in formation]

CATEGORIES

STAFF

($000) STAFF ($000) STAFF ($000) STAFF ($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

• Includes Obligations from Prior Year "No Year" Authority.

• Excludes actual reimbursements of $2,456,787 in FY 1993 and estimated reimbursements

of $3,200,000 in FY 1994 and FY 1995 for furnishing steam and chilled water.

[ocr errors]

0

0

33.336

32,777

37,348

4,571

9.14

[blocks in formation]
[blocks in formation]

DOLLARS DOLLARS STAFF ($000) STAFF ($000) STAFF ($000)

DOLLARS

[blocks in formation]
« iepriekšējāTurpināt »