Estimate 1995
Capitol Power Plant

Increases (continued)

OTHER INCREASES

Continuing and Initiating Other Programs (continued)

East Plant Chiller Conversion (continued)

The total cost estimate of the entire project is $2,800,000, of
which $1,800,000 is requested in fiscal year 1994 on a "No Year" basis
for chillers in the east plant (#1, 1A, 2, 2a). The total estimate is
detailed as follows:

[blocks in formation]
[blocks in formation]

Total Continuing and Initiating Other Programs.

Total Increase NONRECURRING ITEMS

NONRECURRING ITEMS (continued)

[blocks in formation]

$1,450,000 455,000

645,000
111,200

7,600
131.200
$2,800,000

[blocks in formation]

All electrical energy is now being purchased from the local public utility. Approximately one-half of the electrical load at the Capitol Power Plant has been purchased since September 1950, and the remaining one-half load since September 1951 when generation of all electrical energy at the Capitol Power Plant was discontinued. The energy purchased for all buildings and grounds under the jurisdiction of the Architect of the Capitol is now 60-cycle alternating current, having been converted from 25-cycle alternating current during the period 1951 · 1963 under funds allowed for such purpose by Congress.

The steam generated by the Capitol Power Plant in fiscal year 1993 was 1,304,737,000 pounds, a 2.6 percent increase over 1992. The stean was supplied to the various buildings served through approximately 3 ailes of steam lines. The new steam generators, new tunnel and steam lines, installed under the Capitol Power Plant Changes and Improvements Project, have been in service since 1954. The output of the refrigeration plant in fiscal year 1993 was approximately 88,923, 292 con-hours of refrigeration, a 7.6 increase over 1992.

Estimate 1995 Capitol Power Plant

Obiectives

This appropriation is for the operation and maintenance of the Capitol Power Plant, which has been
in operation since December 1, 1910. It provides heating and air conditioning refrigeration for the
Capitol, Senate and House Office Buildings, and Library of Congress Buildings; heat for the United States
Botanic Garden; heat and air conditioning for the Senate and House Garages; and steam heat for the
Government Printing Office and the Washington City Post Office, and steam heat and air conditioning for
the Folger Shakespeare Library, Union Station complex, the U. S. Supreme Court Building, and the Thurgood
Marshall Federal Judiciary Building on a reimbursable basis. The Architect of the Capitol performs his
duties in connection with the plant under authority of the Act of March 4, 1911 (36 Stat. 1414).

In addition to heat, air conditioning and electricity, water and sewer services for the Capitol
Complex will be paid to the D.C. Government pursuant to P.L. 101-168.

The total authorized strength for the Capitol Power Plant staff is 101 positions.

9.12

ITEMS UNDER WHICH NO CHANGES OCCUR

Communication Services.
Annual Gas Service.

Purchase of Chilled Water from GSA for Ford House Office Building.
Purchase of Steam from GSA for Ford House Office Building.

Water and Sewer Payments

Asbestos Disposal..

Exterior Pointing and Caulking.

Miscellaneous Improvements.

Reinsulate Steam Lines.

Retube Three Wickes Boilers (No Year)

[ocr errors][ocr errors]

100
1,000
640,000
242,000

260,000

2,129,000

25,000
30,000

50,000

120,000

665,000

9 13

Schedule A

1. Breakdown by Activity:
Capitol Power Plant

Total **

CATEGORIES

2. Breakdown by Object Class:

11 Personnel Compensation

12 Personnel Benefits

13 Benefits to Former Personnel
21 Travel

22 Transportation of Things

23 Rent, Communications and Utilities

24 Printing and Reproduction

25 Other Services

26 Supplies and Materials

31 Equipment

32 Land and Structures

42 Insurance Claims and Indemnities

Total ⚫⚫

[blocks in formation]
[blocks in formation]

33,336

DOLLARS

DOLLARS

DOLLARS

DOLLARS

($000) STAFF ($000) STAFF ($000) STAFF ($000)

33,336 101 32,777 101 37,348

[blocks in formation]

FY 94
ESTIMATE

[ocr errors][merged small]
[blocks in formation]

FY 95
ESTIMATE

32,777

• Includes Obligations from Prior Year "No Year" Authority.

• Excludes actual reimbursements of $2,456,787 in FY 1993 and estimated reimbursements

of $3,200,000 in FY 1994 and FY 1995 for furnishing steam and chilled water.

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

NET CHANGE 94/95

37,348

[blocks in formation]
[blocks in formation]

1.429

1,429

12

393 66

393 66

30 455

2,420

2,462 455 100

[blocks in formation]

4,905

9.15

« iepriekšējāTurpināt »