The Publication Distribution Service Division of The Doorkeeper has recently upgraded and expanded its capabilities which included the installation of new equipment. Extensive modifications to the facilities are required to adequately accommodate this equipment and provide a satisfactory work environment for Publications Distribution Service employees. Due to the broad scope of the changes in the Division's function, work is required in most of the areas assigned to the Division.

These funds are requested to perform these renovations. The work will be performed by skilled temporary personnel supervised by in-house staff. The requested funds have been adjusted from previous requests to account for preliminary work which has been completed by in-house forces with maintenance funds. This request also includes funds for areas added to the scope since the original request. This project was requested and denied in fiscal years 1993 and 1994. Approval to request funds in the fiscal year 1995 budget for this project has been sought from the House Office Building Commission.

Structural Study, Cannon Building Garage Floors.....

The Cannon Building garage floor slab is deteriorating due to the water and salts which are deposited on the slab by automobiles. Concrete pan construction, and its structural integrity, are dramatically affected by this type of deterioration. There is already visible evidence. Small hairline cracks have allowed water-borne chlorides to penetrate the deck and attack the reinforcing bars. causes corrosion, oxidation and in turn, expansion generating enough force to cause the concrete to spall and delaminate. This destructive action, if allowed to continue, could lead to severe structural damage.

This

.$ 437,000

$

50,000

8.8

[blocks in formation]

Cyclical Maintenance

OTHER INCREASES

NONRECURRING ITEMS

Structural Study, Cannon Building Garage Floors (continued)

out

The

recommended

method of repair

involves the
delaminated and spalled areas by sawcutting the damaged area, chipping
exposing the
with pneumatic hammers and
Next the reinforcing bar is thoroughly
the bad concrete
deteriorated reinforcing bar.
cleaned by either sandblasting or waterblasting and then painted with
an anti-corrosion coating. A repair mortar is then poured and finished
In some instances additional floor
with a surface coating sealer.
drains are added to eliminate ponding on the deck produced by snowmelt
and rain.

In order to determine the most effective and least costly repair
to the long term
alternatives, as well a make recommendations as
effectiveness of these repairs, it will be necessary to enlist the
a professional engineering restoration firm who will
initiate a condition appraisal of the structure through field survey
services of
systematic approach
They will develop a
and prescribed testing.
listing repair alternatives, cost estimates and, finally, construction
The initial field survey will identify areas which are in
documents.
need of immediate repair.

Approval to request funds in the fiscal year 1995 budget for this project has been sought from the House Office Building Commission. This project was requested and denied in fiscal years 1993 and 1994.

8.9

[graphic]

Estimate 1995

House Office Buildings

.$150,000

[blocks in formation]

Expansion Joint Replacement, Rayburn Building.

structure.

Water is penetrating into the Rayburn Building through the
expansion joint located between the courtyard walls and the main office
and now allow water to enter the wall system.
Sealed joints between stones of the water table have failed
The greatest point of
building.
entry is at the bed joint which is lower than the adjacent soil and
often is below the level of surface water which is trapped next to the

Above the expansion joint is a metal cover which, on the building
side, is let into a reglet cast in to the wall and on the opposite side
is flashed into the built-up waterproof membrane of the courtyard. A
inches below the top of the courtyard wall.
pourable sealer has been applied over the joint cover at a level 3
Water, after entering the
wall system, ponds up on top of the sealer and eventually migrates
reglet or
downward through points of adhesive failure between sealer and wall.
membrane.
At the joint cover, water is able to work around the metal in the
infiltrate down between the metal joint cover and the

The consultant that provided recommendations for the repairs of the
east courtyard, which was funded in fiscal year 1992, recommended
remedial work including the installation of a new elastomeric membrane
tubes.
across the expansion joint at the level of the water table stone bed
joint that will allow water to drain out of the wall through weep
this new area of leakage.
It is proposed to use this system to improve the conditions in

8.10

[blocks in formation]

This condition exists in the center and west courtyards of the Rayburn House Office Building. In fiscal year 1992, $150,000 was appropriated which allowed the repair of the east courtyard. With this request the west courtyard will be waterproofed in fiscal year 1995. The funds will be left in the budget base for fiscal year 1996 to accommodate the repairs in the center courtyard. Approval to request funds in the fiscal year 1995 budget for this project has been sought from the House Office Building Commission. This project was requested and denied in fiscal year 1994.

Modernization of Longworth Toilets and Anterooms.

In response to a long standing need to maximize the efficient use
of existing space within the House Office Buildings, a proposal was
developed to convert certain toilet area anterooms to office space

The men's and women's restrooms on the north end of floors four through seven of the Longworth House Office Buildings can be reconfigured to provide additional office space. These anterooms were originally built to provide passageway and lounge areas for the toilet rooms. Present day use patterns indicate that these areas are not utilized at all, and thus the space is available for other, higher priority, uses such as conversion to office space. When the conversion is completed, approximately 300 square feet of usable office space will be achieved on each floor. At the same time, four sets of the restrooms will be renovated to comply with the recent ADA accessibility standards. Approval to request funds in the fiscal year 1995 budget for this project has been sought from the House Office Building Commission. This project was requested and denied in fiscal year 1994.

$ 299,000

8.11

[graphic]
[blocks in formation]

Escalator Modernization, Longworth and Rayburn Buildings...

in 1964. The House Office Buildings have thirty-one escalators all of which have been in service since occupancy of the Rayburn Building beginning industry safety and design improvements. Since this equipment's installation there have been many Some changes have been made but substantial control and equipment modification are still required.

Buildings have been modernized. Four of the six escalators between the Rayburn and the Longworth The two remaining escalators were 1994 due to serious safety concerns. requested to be modernized with reprogrammed funds during fiscal year If the reprogramming is not approved, full funding for their replacement is included in this request. The balance of the escalators in the Rayburn Building, twenty three in all, should have their safety features and controls updated. Several of these escalators have suffered a high level of wear and could become hazardous if the situation is ignored. These escalators requires attention. receive a high level of maintenance but their continued degradation

Escalator technology has advanced dramatically in the area of
safety and motion sensor and controls since 1958. Escalators have
and death.
recently been the focus of many litigations involving personal injury
The primary factors in most of these incidents were age of
the equipment and lack of modern safety sensors.

modernization and improvement program. This request is to support the continued implementation of a phased As stated before, if the two remaining escalators between the Rayburn and Longworth Buildings cannot funds in this request. be replaced with reprogrammed funds, then they will be replaced with The balance would then be used to upgrade five

of the remaining 23 escalators in the Rayburn Building. Should

$ 580,000

8.12