themselves, of water users in Arizona, Nevada, and California which are senior to diversions for the Central Arizona Project, or amend any provisions of said decree.

(c) Augmentation of water supply of the Colorado River system.

The limitation stated in subsection (b) of this section shall not apply so long as the Secretary shall determine and proclaim that means are available and in operation which augment the water supply of the Colorado River system in such quantity as to make sufficient mainstream water available for release to satisfy annual consumptive use of seven million five hundred thousand acre-feet in Arizona, California, and Nevada. (Pub. L. 90-537, title III, §301, Sept. 30, 1968, 82 Stat. 887.)

§ 1522. Orme Dam and Reservoir.

(a) Acquisition of lands of the Salt River Pima-Maricopa Indian Community and the Fort McDowellApache Indian Community; relocation; eminent domain.

The Secretary shall designate the lands of the Salt River Pima-Maricopa Indian Community, Arizona, and the Fort McDowell-Apache Indian Community, Arizona, or interests therein, and any allotted lands or interests therein within said communities which he determines are necessary for use and occupancy by the United States for the construction, operation, and maintenance of Orme Dam and Reservoir, or alternative. The Secretary shall offer to pay the fair market value of the lands and interests designated, inclusive of improvements. In addition, the Secretary shall offer to pay toward the cost of relocating or replacing such improvements not to exceed $500,000 in the aggregate, and the amount offered for the actual relocation or replacement of a residence shall not exceed the difference between the fair market value of the residence and $8,000. Each community and each affected allottee shall have six months in which to accept or reject the Secretary's offer. If the Secretary's offer is rejected, the United States may proceed to acquire the property interests involved through eminent domain proceedings in the United States District Court for the District of Arizona under sections 257 and 258a of Title 40. Upon acceptance in writing of the Secretary's offer, or upon the filing of a declaration of taking in eminent domain proceedings, title to the lands or interests involved, and the right to possession thereof, shall vest in the United States. Upon a determination by the Secretary that all or any part of such lands or interests are no longer necessary for the purpose for which acquired, title to such lands or interests shall be restored to the appropriate community upon repayment to the Federal Government of the amounts paid by it for such lands.

(b) Rights of former owners to use or lease land. Title to any land or easement acquired pursuant to this section shall be subject to the right of the former owner to use or lease the land for purposes not inconsistent with the construction, operation, and maintenance of the project, as determined by, and under terms and conditions prescribed by, the Secretary. Such right shall include the right to extract and dispose of minerals. The determination

of fair market value under subsection (a) of this section shall reflect the right to extract and dispose of minerals and all other uses permitted by this section.

(c) Addition of land to Fort McDowell Indian Reservation.

In view of the fact that a substantial portion of the lands of the Fort McDowell Mohave-Apache Indian Community will be required for Orme Dam and Reservoir, or alternative, the Secretary shall, in addition to the compensation provided for in subsection (a) of this section, designate and add to the Fort McDowell Indian Reservation twenty-five hundred acres of suitable lands in the vicinity of the reservation that are under the jurisdiction of the Department of the Interior in township 4 north, range 7 east; township 5 north, range 7 east; and township 3 north, range 7 east, Gila and Salt River base meridian, Arizona. Title to lands so added to the reservation shall be held by the United States in trust for the Fort McDowell Mohave-Apache Indian Community.

(d) Recreational facilities developed and operated by Indian communities along Orme Reservoir shoreline.

Each community shall have a right, in accordance with plans approved by the Secretary, to develop and operate recreational facilities along the part of the shoreline of the Orme Reservoir located on or adjacent to its reservation, including land added to the Fort McDowell Reservation as provided in subsection (b) of this section, subject to rules and regulations prescribed by the Secretary governing the recreation development of the reservoir. Recreation development of the entire reservoir and federally owned lands under the jurisdiction of the Secretary adjacent thereto shall be in accordance with a master recreation plan approved by the Secretary. The members of each community shall have nonexclusive personal rights to hunt and fish on or in the reservoir without charge to the same extent they are now authorized to hunt and fish, but no community shall have the right to exclude others from the reservoir except by control of access through its reservation or any right to require payment by members of the public except for the use of community lands or facilities.

(e) Exemption of funds from State and Federal income taxes.

All funds paid pursuant to this section, and any per capita distribution thereof, shall be exempt from all forms of State and Federal income taxes. (Pub. L. 90-537, title III, § 302, Sept. 30, 1968, 82 Stat. 888.) SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in section 1527 of this title.

§ 1523. Power requirements of Central Arizona Project and augmentation of Lower Colorado River Basin Development Fund.

(a) Engineering and economic studies.

The Secretary is authorized and directed to continue to a conclusion appropriate engineering and economic studies and to recommend the most feasible plan for the construction and operation of hydroelectric generating and transmission facilities, the

purchase of electrical energy, the purchase of entitlement to electrical plant capacity, or any combination thereof, including participation, operation, or construction by non-Federal entities, for the purpose of supplying the power requirements of the Central Arizona Project and augmenting the Lower Colorado River Basin Development Fund: Provided, That nothing in this section or in this Act contained shall be construed to authorize the study or construction of any dams on the main stream of the Colorado River between Hoover Dam and Glen Canyon Dam.

(b) Construction of thermal generating powerplants; agreements for acquisition by United States of portions of plant capacity.

If included as a part of the recommended plan, the Secretary may enter into agreements with non-Federal interests proposing to construct thermal generating powerplants whereby the United States shall acquire the right to such portions of their capacity, including delivery of power and energy over appurtenant transmission facilities to mutually agreed upon delivery points, as he determines is required in connection with the operation of the Central Arizona Project. When not required for the Central Arizona Project, the power and energy acquired by such agreements may be disposed of intermittently by the Secretary for other purposes at such prices as he may determine, including its marketing in conjunction with the sale of power and energy from Federal powerplants in the Colorado River system so as to produce the greatest practicable amount of power and energy that can be sold at firm power and energy rates. The agreement shall provide among other things, that

(1) the United States shall pay not more than that portion of the total construction cost, exclusive of interest during construction, of the powerplants, and of any switchyards and transmission facilities serving the United States, as is represented by the ratios of the respective capacities to be provided for the United States therein to the total capacities of such facilities. The Secretary shall make the Federal portion of such costs available to the non-Federal interests during the construction period, including the period of preparation of designs and specifications, in such installments as will facilitate a timely construction schedule, but no funds other than for preconstruction activities shall be made available by the Secretary until he determines that adequate contractual arrangements have been entered into between all the affected parties covering land, water, fuel supplies, power (its availability and use), rights-of-way, transmission facilities and all other necessary matters for the thermal generating powerplants;

(2) annual operation and maintenance costs shall be apportioned between the United States and the non-Federal interests on an equitable basis taking into account the ratios determined in accordance with the foregoing clause (1): Provided, however, That the United States shall share on the foregoing basis in the depreciation component of such costs only to the extent of provision

for depreciation on replacements financed by the non-Federal interests;

(3) the United States shall be given appropriate credit for any interests in Federal lands administered by the Department of the Interior that are made available for the powerplants and appurtenances;

(4) costs to be borne by the United States under clauses (1) and (2) shall not include (a) interest and interest during construction, (b) financing charges, (c) franchise fees, and (d) such other costs as shall be specified in the agreement.

(c) Recommended plan; submission to Congress.

No later than one year from September 30, 1968, the Secretary shall submit his recommended plan to the Congress. Except as authorized by subsection (b) of this section, such plan shall not become effective until approved by the Congress.

(d) Apportionment of water for Arizona plants diverted above Lee Ferry.

If any thermal generating plant referred to in subsection (b) of this section is located in Arizona, and if it is served by water diverted from the drainage area of the Colorado River system above Lee Ferry, other provisions of existing law to the contrary notwithstanding, such consumptive use of water shall be a part of the fifty thousand acre-feet per annum apportioned to the State of Arizona by article III(a) of the Upper Colorado River Basin Compact (63 Stat. 31). (Pub. L. 90-537, title III, § 303, Sept. 30, 1968, 82 Stat. 889.)

REFERENCES IN TEXT

This Act, referred to in text, is the Colorado River Basin Project Act, Pub. L. 90-537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to this chapter. See Short Title note under section 1501 of this title for classification of sections of the Act outside this chapter.

§ 1524. Water furnished from Central Arizona Project. (a) Restriction on use of water for irrigation.

Unless and until otherwise provided by Congress, water from the Central Arizona Project shall not be made available directly or indirectly for the irrigation of lands not having a recent irrigation history as determined by the Secretary, except in the case of Indian lands, national wildlife refuges, and, with the approval of the Secretary, State-administered wildlife management areas.

(b) Contracts with municipal and industrial users.

(1) Irrigation and municipal and industrial water supply under the Central Arizona Project within the State of Arizona may, in the event the Secretary determines that it is necessary to effect repayment, be pursuant to master contracts with organizations which have power to levy assessments against all taxable real property within their boundaries. The terms and conditions of contracts or other arrangements whereby each such organization makes water from the Central Arizona Project available to users within its boundaries shall be subject to the Secretary's approval, and the United States shall, if the Secretary determines such action is desirable to facilitate carrying out the provisions of this Act, have the right to require that it be a party to such contracts or that contracts subsidiary to the master contracts be entered into between the United States and any user. The provisions of this clause (1) shall not apply to the supplying of water to an Indian tribe for use within the boundaries of an Indian reservation.

(2) Any obligation assumed pursuant to section 485h(d) of this title with respect to any project contract unit or irrigation block shall be repaid over a basic period of not more than fifty years; any water service provided pursuant to section 485h(e) of this title may be on the basis of delivery of water for a period of fifty years and for the delivery of such water at an identical price per acre-foot for water of the same class at the several points of delivery from the main canals and conduits and from such other points of delivery as the Secretary may designate; and long-term contracts relating to irrigation water supply shall provide that water made available thereunder may be made available by the Secretary for municipal or industrial purposes if and to the extent that such water is not required by the contractor for irrigation purposes.

(3) Contracts relating to municipal and industrial water supply under the Central Arizona Project may be made without regard to the limitations of the last sentence of section 485h (c) of this title; may provide for the delivery of such water at an identical price per acre-foot for water of the same class at the several points of delivery from the main canals and conduits; and may provide for repayment over a period of fifty years if made pursuant to clause (1) of said section and for the delivery of water over a period of fifty years if made pursuant to clause (2) thereof. (c) Water conservation.

Each contract under which water is provided under the Central Arizona Project shall require that (1) there be in effect measures, adequate in the judgment of the Secretary, to control expansion of irrigation from aquifers affected by the irrigation in the contract service area; (2) the canals and distribution systems through which water is conveyed after its delivery by the United States to the contractors shall be provided and maintained with linings adequate in his judgment to prevent excessive conveyance losses; and (3) neither the contractor nor the Secretary shall pump or permit others to pump ground water from within the exterior boundaries of the service area of a contractor receiving water from the Central Arizona Project for any use outside said contractor's service area unless the Secretary and such contractor shall agree, or shall have previously agreed, that a surplus of ground water exists and that drainage is or was required. Such contracts shall be subordinate at all times to the satisfaction of all existing contracts between the Secretary and users in Arizona heretofore made pursuant to the Boulder Canyon Project Act.

(d) Water exchanges.

The Secretary may require in any contract under which water is provided from the Central Arizona Project that the contractor agree to accept main stream water in exchange for or in replacement of existing supplies from sources other than the main stream. The Secretary shall so require in the case of users in Arizona who also use water from the Gila River system to the extent necessary to make available to users of water from the Gila River system in

47-5000-71-vol. 10-23

New Mexico additional quantities of water as provided in and under the conditions specified in subsection (f) of this section: Provided, That such exchanges and replacements shall be accomplished without economic injury or cost to such Arizona contractors.

(e) Water shortage priorities.

In times of shortage or reduction of main stream Colorado River water for the Central Arizona Project, as determined by the Secretary, users which have yielded water from other sources in exchange for main stream water supplied by that project shall have a first priority to receive main stream water, as against other users supplied by that project which have not so yielded water from other sources, but only in quantities adequate to replace the water so yielded.

(f) New Mexico users; water exchange contracts.

(1) In the operation of the Central Arizona Project, the Secretary shall offer to contract with water users in New Mexico for water from the Gila River, its tributaries and underground water sources in amounts that will permit consumptive use of water in New Mexico of not to exceed an annual average in any period of ten consecutive years of eighteen thousand acre-feet, including reservoir evaporation, over and above the consumptive uses provided for by article IV of the decree of the Supreme Court of the United States in Arizona against California (376 U.S. 340). Such increased consumptive uses shall not begin until, and shall continue only so long as, delivery of Colorado River water to downstream Gila River users in Arizona is being accomplished in accordance with this Act, in quantities sufficient to replace any diminution of their supply resulting from such diversion from the Gila River, its tributaries and underground water sources. In determining the amount required for this purpose full consideration shall be given to any differences in the quality of the waters involved.

(2) The Secretary shall further offer to contract with water users in New Mexico for water from the Gila River, its tributaries, and underground water sources in amounts that will permit consumptive uses of water in New Mexico of not to exceed an annual average in any period of ten consecutive years of an additional thirty thousand acre-feet, including reservoir evaporation. Such further increases in consumptive use shall not begin until, and shall continue only so long as, works capable of augmenting the water supply of the Colorado River system have been completed and water sufficiently in excess of two million eight hundred thousand acre-feet per annum is available from the main stream of the Colorado River for consumptive use in Arizona to provide water for the exchanges herein authorized and provided. In determining the amount required for this purpose full consideration shall be given to any differences in the quality of the waters involved.

(3) All additional consumptive uses provided for in clauses (1) and (2) of this subsection shall be subject to all rights in New Mexico and Arizona as established by the decree entered by the United States District Court for the District of Arizona on

June 29, 1935, in United States against Gila Valley § 1526. Water salvage programs. Irrigation District and others (Globe Equity Numbered 59) and to all other rights existing on September 30, 1968, in New Mexico and Arizona to water from the Gila River, its tributaries, and underground water sources, and shall be junior thereto and shall be made only to the extent possible without economic injury or cost to the holders of such rights.

(g) Restriction on use of water for production of basic agricultural commodities on newly irrigated

lands.

For a period of ten years from September 30, 1968, no water from the projects authorized by this Act shall be delivered to any water user for the production on newly irrigated lands of any basic agricultural commodity, as defined in the Agricultural Act of 1949, or any amendment thereof, if the total supply of such commodity for the marketing year in which the bulk of the crop would normally be marketed is in excess of the normal supply as defined in section 1301(b) (10) of Title 7, unless the Secretary of Agriculture calls for an increase in production of such commodity in the interest of national security. (Pub. L. 90-537, title III, § 304, Sept. 30, 1968, 82 Stat. 891.)

REFERENCES IN TEXT

This Act, referred to in text, is the Colorado River Basin Project Act, Pub. L. 90-537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to this chapter. See Short Title note under section 1501 of this title for classification of sections of the Act outside this chapter.

The Boulder Canyon Project Act, referred to in text, is act Dec. 21, 1928, ch. 42, 45 Stat. 1057, which is classified to section 617 et seq. of this title.

The Agricultural Act of 1949, referred to in text, is act Oct. 31, 1949, ch. 792, 83 Stat. 1051, which is classified principally to section 1421 et seq. of Title 7, Agriculture. See Short Title note under section 1421 of Title 7.

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 1521, 1543 of this title.

§ 1525. Cost of main stream water of the Colorado River.

To the extent that the flow of the main stream of the Colorado River is augmented in order to make sufficient water available for release, as determined by the Secretary pursuant to article II(b) (1) of the decree of the Supreme Court of the United States in Arizona against California (376 U.S. 340), to satisfy annual consumptive use of two million eight hundred thousand acre-feet in Arizona, four million four hundred thousand acre-feet in California, and three hundred thousand acre-feet in Nevada, respectively, the Secretary shall make such water available to users of main stream water in those States at the same costs (to the extent that such costs can be made comparable through the nonreimbursable allocation to the replenishment of the deficiencies occasioned by satisfaction of the Mexican Treaty burden as herein provided and financial assistance from the development fund established by section 1543 of this title) and on the same terms as would be applicable if main stream water were available for release in the quantities required to supply such consumptive use. (Pub. L. 90-537, title III, § 305, Sept. 30, 1968, 82 Stat. 893.)

The Secretary shall undertake programs for water salvage and ground water recovery along and adjacent to the main stream of the Colorado River. Such programs shall be consistent with maintenance of a reasonable degree of undisturbed habitat for fish and wildlife in the area, as determined by the Secretary. (Pub. L. 90-537, title III, § 306, Sept. 30, 1968, 82 Stat. 893.)

§ 1527. Fish and wildlife conservation and development.

The conservation and development of the fish and wildlife resources and the enhancement of recreation opportunities in connection with the project works authorized pursuant to this subchapter shall be in accordance with the provisions of the Federal Water Project Recreation Act, except as provided in section 1522 of this title. (Pub. L. 90-537, title III, § 308, Sept. 30, 1968, 82 Stat. 893.)

REFERENCES IN TEXT

The Federal Water Project Recreation Act, referred to in text, is Pub. L. 89-72, July 9, 1965, 79 Stat. 213, which is classified to sections 4601-5(a), 4601-12 to 4601-21, and 662(d) of Title 16, Conservation.

§ 1528. Authorization of appropriations.

(a) There is hereby authorized to be appropriated for construction of the Central Arizona Project, including prepayment for power generation and transmission faclities but exclusive of distribution and drainage facilities for non-Indian lands, $832,180,000 plus or minus such amounts, if any, as may be justifed by reason of ordinary fluctuations in construction costs as indicated by engineering cost indices applicable to the types of construction involved therein and, in addition thereto, such sums as may be required for operation and maintenance of the project.

(b) There is also authorized to be appropriated $100,000,000 for construction of distribution and drainage facilities for non-Indian lands. Notwithstanding the provisions of section 1543 of this title, neither appropriations made pursuant to the authorization contained in this subsection nor revenues collected in connection with the operation of such facilities shall be credited to the Lower Colorado River Basin Development Fund and payments shall not be made from that fund to the general fund of the Treasury to return any part of the costs of construction, operation, and maintenance of such facilities. (Pub. L. 90-537, title III, § 309, Sept. 30. 1968, 82 Stat. 893.)

SUBCHAPTER IV. - LOWER COLORADO RIVER BASIN DEVELOPMENT FUND

§ 1541. Allocation of costs; repayment.

Upon completion of each lower basin unit of the project herein or hereafter authorized, or separate feature thereof, the Secretary shall allocate the total costs of constructing said unit or features to (1) commercial power, (2) irrigation, (3) municipal and industrial water supply, (4) flood control, (5) navigation, (6) water quality control, (7) recreation, (8) fish and wildlife, (9) the replenishment of the depletion of Colorado River flows available for use in the United States occasioned by performance of the Water Treaty of 1944 with the United Mexican States (Treaty Series 994; 59 Stat. 1219), and (10) any other purposes authorized under the Federal reclamation laws. Costs of construction, operation, and maintenance allocated to the replenishment of the depletion of Colorado River flows available for use in the United States occasioned by compliance with the Mexican Water Treaty (including losses in transit, evaporation from regulatory reservoirs, and regulatory losses at the Mexican boundary, incurred in the transportation, storage, and delivery of water in discharge of the obligations of that treaty) shall be nonreimbursable: Provided, That the nonreimbursable allocation shall be made on a pro rata basis to be determined by the ratio between the amount of water required to comply with the Mexican Water Treaty and the total amount of water by which the Colorado River is augmented pursuant to the investigations authorized subchapter II of this chapter and any future Congressional authorization. The repayment of costs allocated to recreation and fish and wildlife enhancement shall be in accordance with the provisions of the Federal Water Project Recreation Act: Provided, That all of the separable and joint costs alocated to recreation and fish and wildlife enhancement as a part of the Dixie project, Utah, shall be nonreimbursable. Costs allocated to nonreimbursable purposes shall be nonreturnable under the provisions of this Act. (Pub. L. 90-537 title IV, § 401, Sept. 30, 1968, 82 Stat. 894.)

REFERENCES IN TEXT

This Act, referred to in text, is the Colorado River Basin Project Act, Pub. L. 90-537, Sept. 30, 1968, 82 Stat. 885, which is classified principally to this chapter. See Short Title note under section 1501 of this title for classification of sections of the Act outside this chapter.

The Federal reclamation laws, referred to in text, are classified principally to this title.

The Federal Water Project Recreation Act, referred to in text, is Pub. L. 89-72, July 9, 1965, 79 Stat. 213, which is classified to sections 460l-5(a), 4601-12 to 4601-21, and 662(d) of Title 16, Conservation.

§1542. Repayment capability of Indian lands.

The Secretary shall determine the repayment capability of Indian lands within, under, or served by any unit of the project. Construction costs allocated to irrigation of Indian lands (including provision of water for incidental domestic and stock water uses) and within the repayment capability of such lands shall be subject to section 386a of Title 25, and such costs that are beyond repayment cараbility of such lands shall be nonreimbursable. (Pub. L. 90-537, title IV, § 402, Sept. 30, 1968, 82 Stat. 894.) §1543. Lower Colorado River Basin Development Fund.

(a) Establishment.

There is hereby established a separate fund in the Treasury of the United States to be known as the Lower Colorado River Basin Development Fund (hereafter called the "development fund"), which shall remain available until expended as hereafter provided.

(b) Appropriations.

All appropriations made for the purpose of carrying out the provisions of subchapter III of this chapter shall be credited to the development fund as

advances from the general fund of the Treasury, and shall be available for such purpose.

(c) Revenues credited to fund.

There shall also be credited to the development fund

(1) all revenues collected in connection with the operation of facilities authorized in subchapter III of this chapter in furtherance of the purposes of this Act (except entrance, admission, and other recreation fees or charges and proceeds received from recreation concessionaires), including revenues which, after completion of payout of the Central Arizona Project as required herein are surplus, as determined by the Secretary, to the operation, maintenance, and replacement requirements of said project;

(2) any Federal revenues from the Boulder Canyon and Parker-Davis projects which, after completion of repayment requirements of the said Boulder Canyon and Parker-Davis projects, are surplus, as determined by the Secretary, to the operation, maintenance, and replacement requirements of those projects: Provided, however, That the Secretary is authorized and directed to continue the in-lieu-of-tax payments to the States of Arizona and Nevada provided for in section 618 a(c) of this title so long as revenues accrue from the operation of the Boulder Canyon project; and

(3) any Federal revenues from that portion of the Pacific Northwest-Pacific Southwest intertie located in the States of Nevada and Arizona which, after completion of repayment requirements of the said part of the Pacific Northwest-Pacific Southwest intertie located in the States of Nevada and Arizona, are surplus, as determined by the Secretary, to the operation, maintenance, and replacement requirements of said portion of the Pacific Northwest-Pacific Southwest intertie and related

facilities.

(d) Use of revenue funds.

All moneys collected and credited to the development fund pursuant to subsection (b) and clauses (1) and (3) of subsection (c) of this section and the portion of revenues derived from the sale of power and energy for use in Arizona pursuant to clause (2) of subsection (c) of this section shall be available, without further appropriation, for

(1) defraying the costs of operation, maintenance, and replacements of, and emergency expenditures for, all facilities of the projects, within such separate limitations as may be included in annual appropriation Acts; and

(2) payments to reimburse water users in the State of Arizona for losses sustained as a result of diminution of the production of hydroelectric power at Coolidge Dam, Arizona, resulting from exchanges of water between users in the States of Arizona and New Mexico as set forth in section 1524(f) of this title.

(e) Appropriation by Congress required for construction of works.

Revenues credited to the development fund shall not be available for construction of the works comprised within any unit of the project herein or